Dear David, Thanks so much for your prompt reply.
I took a look at the sticky post on this forum, but it wasn't like the problem I described here. I am running an experiment over a region from 1959 to 2005. The experiment will be stopped at points (e.g., 1959/12/1, 1959/12/11, 1960/1/1, 1960/1/21, 1960/2/1, 1960/2/1, 1960/2/21, 1960/12/21, 1961/1/1, 1961/1/11, 1961/1/21/ 1961/2/1, 1961/12/11, and so on). These points can be referred to MWLE in the leave file. It seems that the experiment will be stopped at these dates every year (e.g., 1959, 1960, 1961,...). After the experiment has been stopped, I can restart the experiment without any problem. However, I need to manually restart the experiment at these dates every year. I need to check the experiment every day and the historical simulation already took a lot of time. I am thus wondering if there is a problem regarding the experiment and how i could solve this problem in order to finish the experiment faster.
Thank you very much for you help.
Regards, Larry
|